Nova Metal Saves 67% in CNC Cutting Time with SolidCAM's iMachining!


  Job Shop

SolidCAM visited Nova Metal to demonstrate iMachining 2D on steel.

Lees meer 

Kingdom Flow Control Co. Reports 50% Cycle Time Savings Using iMachining 3D + HSM vs. Competitor CAM …


  iMachining successes at Customers

SolidCAM recently visited Kingdom Flow Control Co., LTD., to demonstrate iMachining 3D + HSM. Kingdom was using a competitor CAM that needed 5 hours to process the part.

Lees meer 

Nordwig Werkzeugbau GmbH achieved a reduction in cycle time with iMachining of up to 80%


  Job Shop

After evaluating the SolidCAM Trial version, Nordwig Werkzeugbau used iMachining to reduce their cycle times by 80%.

Lees meer 

iMachining 3D Reduces Cycle Time for Workpieces in Aluminum by 40% & Stainless Steel by 77%


  Job Shop

By using iMachining 3D, Bock and Klingenberg reduced milling times by 40% and 77%.

Lees meer 

SolidCAM France replaced 2 Competitor CAM seats thanks to Partner/iMachining/Multiblade module


  Aerospace

...thanks to iMachining, I got the full attention of the manager and they started to envisage to change their CAM System.

Lees meer 

iMachining 3D + HSM Finish Results - Fantastic!


  Job Shop

Finish achieved was 0.37 Ra Value, which is about half of what was expected!!!

Lees meer